Project Details
This group development for Ampy Metering Limited allowed KGM to showcase our installation skills, giving our client one the most prestigious manufacturing facilities in the area.
The 6000m2 Quedron site assembled roof finished in a 25 year warranted plastisol was installed with an internal pvc membrane lined composite guttering system.